Stock Number: 211883
Make: JLG
Model: 1930ES
Year: 2013


Stock Number: 2-18-UEATT-19
Make: Misc
Model: CARRIAGE
Year: 0


Stock Number: 2-18-UEATT-5
Make: Misc
Model: BUCKET
Year: 0


Stock Number: EQU004256
Make: Toyota
Model: 8FD40U
Year: 2014


Stock Number: 232187
Make: WackerNeuson
Model: WK HI400HD D
Year: 2013


Stock Number: EQU002274
Make: CAT
Model: P7000-LE
Year: 2013


 
Comedil Self Erect Cranes

Comedil Self Erect Cranes

The tower crane's base is usually bolted to a large concrete pad that provides really crucial support. The base is connected to a mast or a tower and stabilizes the crane which is connected to the inside of the building's structure. Normally, this attachment point is to an elevator shaft or to a concrete lift.

The mast of the crane is usually a triangulated lattice structure which measures 10 feet square or 0.9m2. Connected to the very top of the mast is the slewing unit. The slewing unit is made of a motor and a gear that enable the crane to rotate.

Tower cranes may have a max unsupported height of 80m or 265 feet, while the minimum lifting capacity of a tower crane is 16,642 kilograms or 39,690 pounds with counter weights of 20 tons. In addition, two limit switches are used in order to make certain that the operator does not overload the crane. There is even another safety feature called a load moment switch to make certain that the driver does not surpass the ton meter load rating. Finally, the maximum reach of a tower crane is 230 feet or 70 meters.

There is definitely a science involved with erecting a tower crane, especially due to their extreme heights. At first, the stationary structure has to be brought to the construction site by using a huge tractor-trailer rig setup. After that, a mobile crane is utilized so as to assemble the machinery portion of the jib and the crane. Afterwards, these parts are connected to the mast. The mobile crane next adds counterweights. Forklifts and crawler cranes could be some of the other industrial machines which is typically used to erect a crane.

Mast extensions are added to the crane as the building is erected. This is how the height of the crane is able to match the building's height. The crane crew utilizes what is called a top climber or a climbing frame that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. Once complete, the slewing unit is able to detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an extra 20 feet or 6.1m. Then, the driver of the crane utilizes the crane to insert and bolt into place another mast part piece.

  • Hyster Outdoor Forklift
    Unisource - For over 90 brands of material handling machinery in addition to more than 4.8 million replacement parts and accessories, ... More
  • Mitsubishi Big Forklifts
    Lift truck operators are normally on the trucks more than 7 out of 8 hours per day in several forklift corporations. Operators will be ... More
  • Potain Construction Cranes
    Potain is a world leader in the industry of construction cranes. This is a specific kind which belongs to Manitowoc. They specify in ... More
  • Nissan Stand Up Forklift
    It is totally different to use a stand-up lift truck compared to a sit-down unit. The way you transport and lift cargo along with your ... More
  • Snorkel Boom Lifts
    Back during the year 1946, Wally Johnson began to create the markets for the scaffold towers and aerial work platforms all by himself. ... More